CIVE5975M01 Foundation Engineering

Calculator instructions:

  • You are allowed to use a calculator or a computer calculator in this assessment.

Dictionary instructions:

  • You are allowed to use your own dictionary in this assessment and/or the Spell Checker facility on your computer.

Assessment Information:

  • There are 5 pages to this online assessment.
  • You will have 6 hours to complete the assessment.
  • This assessment is worth 70% of the overall module mark.
  • Question A, which is in five parts, is worth 40 marks. The questions in Section B are worth 20 marks each
  • Candidates are expected to make reasonable assumptions about any data not provided in the questions. In such cases, any assumed information must be stated clearly in the answers provided.
  • It is anticipated that this assessment should take about 3 hours to complete
  • The deadline for submission of your assessment is between: 09:00 to 15:00 on Wednesday 12 January 2022 (UK time).
  • Please submit your assessment to the ‘Exam Submission’ area on the module’s Minerva page.
  • Please include your Student Identification Number (SID) in the title of your submission.
  • Please number every page of your submission in consecutive order.
  • If there is anything that needs clarification or you have any problems, please email civil@leeds.ac.uk and we will respond to you as quickly as possible within normal working hours UK time (9:00-17:00 hours, Monday-Friday). Remember to include your student name, ID and the full module details (module code and title).
  • You must not discuss or share the content of or answers to this assessment, with any fellow students, any staff or other contacts outside the school or the University’s professional services. School contacts available to you are in the bullet point above.

Section A

  1. Attempt this entire question. Each part is worth 8 marks.
  • Figure A1a is a cross section of an existing two-storey brick house built about 1930. The Figure shows the foundations and underlying geological profile. It is proposed to build a single storey brick extension attached to the existing house as indicated on Figure A1a. Briefly describe the issues to be addressed when designing the foundations for the extension. Suggest appropriate foundations for the extension giving reasons for your choice.

Figure A1a The soil and soil property profiles and location of the extension relative to the existing house (note the foundations for the extension are not shown)

[8 marks]

  • A new four-storey building is to be built adjacent to an existing three-storey building. The concrete foundations for the existing building are 0.9m wide with the formation level at 0.6m below ground level as shown on Figure A1b. Figure A1b also shows the location of the new building and its foundations, and the geological profile. Estimate the additional settlement of the existing building due to the construction of the new building.

Figure A1b Cross section showing the soil profile and the location of the existing and new foundations

[8 marks]

  • It is proposed to pre-consolidate a 3m layer of alluvial clay underlain by dense sand prior to developing the site. The coefficient of volume change of the clay, mv, varies with depth, z, from the top of the alluvial clay such that [mv = 0.1 – 0.01z] m2/MN. Calculate the settlement of the alluvial clay assuming:
    • Vacuum consolidation;
    • or a 3m thick layer of engineered fill.

[8 marks]

  • A concrete floor of a shed used to store de-icing salt has cracked leading to pollution of the groundwater. An investigation showed that the floor was made of 150mm thick 10m by 10m lightly reinforced concrete slabs cast onto 0.5m of compacted sand and gravel. The compacted sand and gravel is underlain by sand with an SPTN60 value of

15. This sand layer is 5m thick and is underlain by weathered sandstone. A forensic investigation showed that the unit weight of the salt was 12.5kN/m3 and the height of the stockpile varied from a maximum height of 5m in summer when the salt was stored to zero at the end of the winter after the salt had been used. The shed is 10 years old and has been used to store de-icing salt throughout that period. Estimate the settlement of the floor and comment on whether that is the reason for the cracking.

[8 marks]

  • Piles are to be used as anchors for ships tied up to a quay wall. Calculate the lateral resistance of the 0.5 diameter 5m long concrete pile shown in Figure A1e. The piles are installed in engineered fill, which is formed of coarse-grained soil. The river level is 2m below ground level. Assume the unit weight of the engineered fill above the ground water level is 16kN/m3 and, below the ground water level 19kN/m3. The angle of friction of the fill is 35o.

Figure A1e Cross section of a quay wall showing the location of the 5m long 0.5m diameter anchor pile

[8 marks]

Section B

  • A 20m diameter, 10m high oil tank is to be built as part of a tank farm. The tank weighs 238 tonnes when empty. The site is underlain by 5m alluvial clays. The alluvial clays are underlain by sand, which has an SPTN60 value of 25. Prior to construction, the 0.3m thick layer of topsoil will be removed. The top soil will be replaced with a 1m thick compacted gravel platform with a geogrid layer to allow access for the construction vehicles and form the foundation for the oil tank. The alluvial clay is 10m thick and is underlain by dense sand and its properties are given in Table B2. The ground water level is at 1m below the original ground surface.

The integrity of the tank will be tested by filling it with water. This will have to be carried out in stages to allow the clay to consolidate thus preventing failure during filling.

  • Determine the maximum level of water at the end of the first stage of filling.
    • Determine the settlement at the end of the first stage of filling.
    • Determine the time for the settlement to occur at the end of the first stage of filling.
    • Suggest three methods to accelerate the construction programme.
Unit weight16kN/m3
Undrained shear strength15kPa
Vertical coefficient of consolidation1.5m2/yr
Coefficient of volume compressibility0.9m2/MN

Table B2 The properties of the alluvial clays

[20 marks]

  • 0.3m diameter cfa piles will be used to support the slurry tank shown in Figure B3. The ground level around the building will be raised by 2m using coarse grained engineered fill after the tank is built so that the new ground level is level with the top of the tank. Assume that the walls and floor of the concrete tank are 0.2m thick and the density of the slurry is 1100kg/m3.
    • Produce a diagram showing the forces acting on the pile group and calculate the maximum load on the pile group.
    • Determine the number and length of piles using a global factor of safety of 2.

Figure B3 Cross section showing the soil profile and location of tank (note the piles are not shown)

[20 marks]

  • A 15m high, 8m diameter steel grain silo sits on a square reinforced concrete slab, which rests on firm to stiff clay. The slab is 2m deep with the formation level at 1.5m below ground level. Details of the ground conditions are given in Table B4. The mass of the silo including the weight of the foundation is 45 tonnes. The silo stores grain with a density of 790kg/m3. The maximum wind load produces a horizontal force of 30kN acting at 10m above ground level.
  • Determine the maximum and minimum contact stress between the base of the foundation and the soil.
    • Check that the concrete slab would provide a stable foundation that satisfies Design Approach 1 Combination 1.
Unit weight18kN/m3
Undrained shear strength0.7σv’
Coefficient of consolidation1.5m2/yr
Coefficient of volume compressibility0.5m2/MN
Ground water level1m bgl

Table B4 Soil profile and properties

此图片的alt属性为空;文件名为428a5d076a5c26765b1d9471292d46cb.jpg

担心学业?你还有其他选择!

KJEssay 学年守护计划!

我们是全网首家积极根据新政策优化应对方案的论文服务机构!

全面升级给你最好的防护!

1、远程代劳,资料下载,作业提交,有需要全程代劳!

KJEssay已对目前主流的教学系统Blackboard、ReCap,以及各校的ePortfolio,对全体老师做过专项培训,这方面有困难的学生,可直接授意老师代劳,我们将为你全面服务!

2、考核考试,老师提前充分备考,同程协助,助力满分!

KJEssay 保障学业提供全面服务!专业老师团队先学习了解课程内容,做充足应对,设计方案,

考试时,老师,专业应急团队,客服,同时待命!

老师快速反应,迅速做出最佳答案以及思路!

应急团队集思广益可对重难点迅速突破!

客服居中,全面负责协调沟通,提高效率!

给予及时而效率的全面帮助!

3、远程上课,录屏打卡课程讨论一个不落!

针对目前在线网课,KJEssay做出专项研究,对包括Autodesk、Azure、Skype、Zoom等视频教学软件有着充分熟悉。上网打卡一个不落。

4、保障隐私安全,全程一人全面追踪服务!所有人均签有隐私合同!

全面服务将主要安排在一位老师全面负责,做好对信息情况的充足了解掌握,不假他手!更因为全程彻底的参与,对情况以及考试有更彻底的把握!更能依据情况做出应对!也更易获取更高分!

客服以及第三方,时刻追踪,定期反馈情况。

5、一举一动全面反馈!时刻监控,看得到的全过程!24小时客服待命!

我们一直把沟通反馈,放在重中之重!尤其是代理服务,最了解的肯定还是客户,所以KJEssay会反馈所有的情况,没有客户允许下,不擅专!不乱动!

以最安全的形式,保障拿到最好的成绩!

在上半年的全面代理中,现已取得了优异的成绩与效果。

此图片的alt属性为空;文件名为35bbe3364a2ce7c2de4d6716ce45b0aa.jpg
此图片的alt属性为空;文件名为d578155fe7f87334ab9d272e80498c2f.jpg
此图片的alt属性为空;文件名为2f1a120444c69fe7a267ab20060348ec.jpg
此图片的alt属性为空;文件名为21d615ec4d8503ac2380cc30732bee21.jpg
此图片的alt属性为空;文件名为200b367966acea40ae507d5cf05e1975.jpg
此图片的alt属性为空;文件名为74dfb41160baebf4cc5f10bdbc4a78bf.jpg
此图片的alt属性为空;文件名为5de508126b22823e6b5b8210a3dca3cf.jpg
此图片的alt属性为空;文件名为6622ac43c8ef56a4c3bdf5cd61fadc69.jpg
此图片的alt属性为空;文件名为6a29689ca0b185e515c419046ec22d0b.jpg
此图片的alt属性为空;文件名为30c701ceae69f917e42864927b0be21a.jpg
此图片的alt属性为空;文件名为12559bac08b9eea12ca431b874504d93.jpg
此图片的alt属性为空;文件名为fcfb0df3fc9bea3e620604f3b628b4a9.jpg
此图片的alt属性为空;文件名为aabedf10bb2cc61671dc64c733ef3b72.jpg
此图片的alt属性为空;文件名为83d41a3f3b3be772e336c842211ed29f.jpg
此图片的alt属性为空;文件名为1b7aff9f394e28fe9016715e48d344eb.jpg
此图片的alt属性为空;文件名为aed4df7939da959d2df596fc6aa534ac.jpg
此图片的alt属性为空;文件名为635115284cf3fb723f9dd2152a8f825f.jpg

新学期,我们应对留学网课,更有经验,更加从容!

关于KJEssay

我们是KJEssay,31639人的选择!

此图片的alt属性为空;文件名为1e348b0dbfb0fe9bc770d4fd66bf5ea4.jpg
此图片的alt属性为空;文件名为7e7391e590eccaf19579cfa2fce375fe.jpg
此图片的alt属性为空;文件名为50c979b700996121b378e00463d9a33c.jpg
此图片的alt属性为空;文件名为15c412569e730f451ed57fe6212af2ec.jpg

现在就可联系我们

此图片的alt属性为空;文件名为c7bcbc86b3a922d4b4fea9d23e58059b.jpg

微信->添加朋友->添加企业微信联系人:13262280223

官网:https://www.kjessay.com

邮箱:kaijiewrite@163.com  service@kjessay.com

WhatsApp:+44 7410496844(推荐添加)

QQ:1483266981

立即联系我们参与活动吧~

了解 KJESSAY历史案例 的更多信息

立即订阅以继续阅读并访问完整档案。

继续阅读